Showing posts with label custom request. Show all posts
Showing posts with label custom request. Show all posts

Friday, July 22, 2011

Claw foot tub has arrived...

We received our claw foot tub on Friday, 07/22/2011.  We are very excited and can't wait until after closing so we can finally have it installed.  We are very grateful that RH installed the plumbing rough-in.

The Victoria ( http://www.thebathspot.com/victoria.htm )





Once installed, we will post more pictures.

Friday, July 1, 2011

VISIT TO THE SITE (MORE PICS)

We couldn't help ourselves, we went to visit the site again today.  We can't believe how different the house looks after one day.  We now have a porch and all of the windows are installed, except for the basement.  We were very pleased (actually, jump up and down for joy happy) to find out that we are able to open the window located in the master bathroom.  We also got to watch the shower spa system be installed and it allowed us to talk directly to the installer to confirm the height of the body sprays and the rainfall shower head that comes out of the ceiling.  Next week we will go back to discuss the specifics regarding the claw foot tub.  We also spoke to the PM about removing the coat closet so the space can be added to the study.  We figured that this space will be better utilized in the study because we would probably only store junk in the coat closet because we plan to use the closet located in the laundry room to store coats among other things (i.e. vacuum cleaner, etc.).  The PM needs to confirm that this is ok; however, it didn't appear to be a problem because it is not a load bearing wall. 

The following are a few pictures that we snapped today.  
 
entering development
right-side of property


front of the house
view from street
 

front of the house
view from street


front of the house
view from left-side property

valve system to accommodate spa shower system located in master bathroom
The valve system is located between the vanity and closet
and we will be able to access it from the closet (if necessary).
For us this was better than having to access it via
under the vanity cabinet.

Spa shower system
Master bathroom

green circle - rainfall shower head from ceiling
(too accommodate this request, they will move the ceiling light back a few inches)

orange circle - rainfall shower head from wall

red circle - body sprays

blue circle - outlet to handheld, which will be
attached to a bar located on the wall on the left

HVAC in attic for 2nd floor

looking at under the solarium
Basement

HVAC for solarium
Basement

storage under stairwell
Basement

HVAC for basement and main floor
and storage area
Basement

basement stairs leading to main floor

powder room rough-in
Basement

space under kitchen and morning room
also you can see a little bit of the media room (we will finish later)
Basement

Egress window, space under dining and living room
Basement



Solarium
view from living room

Dining room w/ bay window
view from living room

Living room
view from dining room

Kitchen
view from dining room

2nd floor (missing stairwell)
view from foyer

walkway to family room
view from foyer

family room
view from main hallway

Morning room
view from outside of family room
Well until next week....and Happy 4th of July!!!!!

Tuesday, June 28, 2011

DIY's Bath Crashers features Moen's Spa System

BD this is for you...

We were watching an episode of Bath Crashers on DIY yesterday evening and noticed that they installed the Moen's Spa Shower system that will be installed into our master bathroom. For more info - bathroom custom request.

Click on link to view the episode:
http://www.diynetwork.com/videos/blinged-out-glamour/58701.html

Also, an awesome TV install as well...however, one of us does not believe a TV belongs in the bathroom, but the other one of us thought it was really cool. 

We are sooooo very excited about the shower system and can't wait to use it.

Enjoy!!!

BD - one more thing, I believe this is the episode that they had to upgrade the water supply system and installed 2 hybrid water heaters.  Not sure if that will help you with you issue, but I thought I would throw that out there.

Tuesday, June 14, 2011

Foundation pictures (taken 06/13 and 06/14)

The first 2 pictures were taken on Monday (06/13/2011) - pouring the foundation.

You can actually see the cement being poured into the walls -
This was a very cool experience.


The following pictures were taken today (Tuesday, 06/14/2011) - foundation.
    

property view
approaching house
 

new ditch in front of house
not sure what for
 

front yard
 

front porch
 

garage
(front view)
 

3 car garage w/ service door
(side view)
  

3 car garage w/ service door
(side view)
   

family room
(side view)


family room and morning room
(back of house)


egress window
(under dining room)

egress window (closer view)
(under dining room)
solarium
(back view)


front of house
taken from the right-side of property


right-side of property to back yard
beside solarium



solarium and dining room
(back right corner of house)

full view
(taken from left corner of property)
 We are expected to receive the lumber tomorrow morning and framing will begin in a week. 

Also, we signed our final change order today to officially add the custom spa shower.  This is sooooo exciting and we can't wait to see the rest of the building process.

Sunday, May 22, 2011

ADDITIONAL CUSTOM REQUESTS

Before we begin this blog, we want to start off by saying that up to this point our RH sales rep. has gone above and beyond our expectations with accommodating our needs and making this process an exceptional experience. 


Now on with the blog...originally we submitted a custom request to add a rainfall shower head from the ceiling to the shower located in the Owner's Suite bathroom.  And then we recently submitted an upgrade to that request to add a vertical spa system.  This system includes 4 programmable presets, 7" rainshower shower head, 3-function handheld shower head w/ 30" slidebar, and 4 jet sprays that all work off of an electronic control panel that is connected to a central valve system.  This system is so cool that we can activate the shower using a remote control.  We knew when we submitted the request that we may have gone to far with this custom request.  We received an email yesterday morning from our RH sales rep. that we really were not expecting, but some how she pulled it off again.  RH approved and will install the custom shower head system and the rainfall shower head from the ceiling. 


The following is a video that we found on youtube that reviews the system - Moen ioDigital Vertical Spa System and Installation


As seen on DIY's Bath Crashers - Blinged Out Glamour episode: http://www.diynetwork.com/videos/blinged-out-glamour/58701.html

Moen Waterhill 10” Rainshower – 10 inch rainfall showerhead



Moen 295 Vertical Spa Shower Trim – ioDigital Vertical Spa Trim


Moen 3384 ioDigital Vertical Spa Valve – ioDigital Vertical Spa Valve
layout




In the same email, we were informed that RH also approved the service door request (located in the garage) and additional insulation request for the garage.  We plan to attend our pre-construction meeting this Thursday to work out the details and submit a change order; and we are scheduled to break ground the following week, on 06/01/2011, weather permitting.


Words can not express how happy we are with RH and our sales rep.  Let the building process begin.

Wednesday, May 18, 2011

CUSTOM TUB - APPROVAL

Currently we live in a 108 year old Victorian house and one of the things we love and will miss the most is the character of the house, which would cost thousands of dollars to replicate in our new house.  We recently remodel our bathroom and at that time, we installed a free-standing claw foot tub.  We really like how it looks so we decided to carry the look into our new house.  However, this time we upgraded to a larger tub with a whirlpool system.  We received the approval from Ryan Homes to install a custom tub in the master bathroom after closing.  To accommodate the size of the tub, Ryan Homes will expand the door into the master bathroom from 2' 6" to 3'.  We also received a $1000 credit. 

The one negative is - we will have to install the tub after closing.  First we need to find a place to store the tub and then we will need to get the tub to the house after closing.  We are going to check with our PM to see if they will be willing to help us with this; otherwise, we will need to contact a professional to help us with the install.  Neither of us are very handy; especially when it comes to plumbing. 

This is a picture from the website.  Please note: Our tub will reflect a ball & claw foot with Old World Bronze finish.
The Victoria


On another note, we are waiting for approval on a custom request to install a rainfall showerhead from the ceiling in the master bathroom shower.