We stopped by the house on Saturday to check out the progress. So much has happened since our last visit. They were installing the carpet (which we will take/post pictures when they are done). Until then, the following pictures were taken on (08/20/2011), which reflect a few other things that have been done since our last visit.
 |
| steps from garage to laundry room |
 |
foyer
view from main stairs |
 |
powder room
main floor |
The gourmet island and almost all of the appliances are installed...
 |
kitchen
view from family room |
 |
kitchen
view from morning room |
 |
| gourmet island |
 |
Dishwasher
GE Profile with SmartDispense Technology (model# PDWT380RSS) |
 |
Double Oven
top: GE Profile Advantium 120V 30" Wall Oven (model# PSB1201NSS)
| bottom: GE Profile 30" Built-in Single Convection Wall Oven (model# PT920SMSS) |
|
 |
Range hood
GE Profile 30" High Performance Range Hood (model# JV536HSS)
and we are waiting for cook top to arrive |
Some pictures of the bathrooms and fixtures...
 |
Shower/Bath
Bath #2 |
 |
Vanity
Bath #2
We plan to replace the mirror |
 |
Vanity
Jack/Jill Bathroom
Bedroom #3 and #4 |
 |
Vanity
Jack/Jill Bathroom
Bedroom #3 and #4 |
 |
Vanity (1 of 2)
Master Bathroom |
Some pictures of the wire shelving....
 |
Walk-in closet on Left
Master Bedroom |
 |
Walk-in closet on right
Master Bedroom |
 |
panel that covers spa valve system
Master Bedroom closet |
 |
wire shelving
Pantry |
 |
wiring shelving above washer/dryer
Laundry room |
Some pictures of the stain on the landings...It is hard to get the stain to match the wood on the stairs and the wood on the landing, but they look great!!! We can't wait to see the final results.
Getting ready to pour the concrete for the walkway...
 |
view from the driveway
--and the light post has been installed |
 |
| view in front of the garage |
 |
view from front yard toward front of house
--and the porch columns have been installed |
Some pictures of the final grading and topsoil...
According to our PM, they power washed the brick today and finished up some minor touch ups. The cleaning will begin on Monday. Next time we visit the house should almost be ready for the final walk-thru, which is scheduled for next Thursday, 09/01. We plan to walk-thru with our home inspector the day prior to the final walk-thru with RH.